Before production
Confirm the duty, body, energy setup, inspection points, and destination documents.
SYS / 01 Manufacturing
Keep the accepted configuration, inspection record, packing marks, and service notes connected.

Keep the quoted configuration visible from review to inspection.
Confirm the duty, body, energy setup, inspection points, and destination documents.
Match the finished units, labels, packing, spare parts, and records to the accepted file.
SYS / 03 Industrial QC path
Specification control is only useful when the inspection and service teams can read the same record.
Route surface, payload, hours, stops, and charging access.
Motor, controller, axle, brake, battery, tires, and body in one file.
Use photos, function checks, packing marks, and serial references.
Send parts, manuals, change notes, and the person who answers next.
SYS / 05 Start the procurement file