Fleet brief
Separate daily routes, work sites, and passenger service before comparing vehicle details.
SYS / 01 Zongshen fleet supply
Describe the route, load, charging window, and service expectation before choosing a Zongshen platform.

Keep the quoted configuration visible from review to inspection.
Separate daily routes, work sites, and passenger service before comparing vehicle details.
Keep motor, controller, axle, brake, battery, tire, and body choices in one dated file.
Use the accepted configuration and its change log as the starting point for the next order.
SYS / 02 Zongshen specification map
Utility work, heavy loads, and passenger service need separate rows in the procurement file.

Zongshen electric tricycles for work routes, industrial yards, and procurement-controlled fleets.
Review category
Durable work-use configurations for buyers comparing axle, motor, braking, and service access.
Review category
Passenger models selected with durable structure, inspection records, and practical local maintenance in mind.
Review categorySYS / 03 Industrial QC path
Specification control is only useful when the inspection and service teams can read the same record.
Route surface, payload, hours, stops, and charging access.
Motor, controller, axle, brake, battery, tires, and body in one file.
Use photos, function checks, packing marks, and serial references.
Send parts, manuals, change notes, and the person who answers next.
SYS / 04 Procurement specification worksheet
Prepare a Zongshen procurement brief around fleet duty cycle, load expectations, route conditions, service needs, and inspection records.
Email summary
Fleet use caseFleet runs repeat daily routes that need stable specification control.
Load and route prioritySpecification should prioritize payload class, axle strength, and braking notes.
Inspection needsNeed inspection photos for model, packing, battery, controller, and labels.
Service priorityNeed service parts list for fleet maintenance planning.
SYS / 05 Start the procurement file