ZS / procurement informationsales@zongshentricycle.com

SYS / 01 Zongshen fleet supply

Put duty cycle before the spec sheet

Describe the route, load, charging window, and service expectation before choosing a Zongshen platform.

Zongshen Tricycle utility electric tricycles
CHECKLISTDuty / load / service

Keep the quoted configuration visible from review to inspection.

01

Fleet brief

Separate daily routes, work sites, and passenger service before comparing vehicle details.

02

Specification

Keep motor, controller, axle, brake, battery, tire, and body choices in one dated file.

03

Repeat batch

Use the accepted configuration and its change log as the starting point for the next order.

SYS / 03 Industrial QC path

Every batch leaves a paper trail.

Specification control is only useful when the inspection and service teams can read the same record.

  1. 01

    Describe the duty

    Route surface, payload, hours, stops, and charging access.

  2. 02

    Freeze the spec

    Motor, controller, axle, brake, battery, tires, and body in one file.

  3. 03

    Record inspection

    Use photos, function checks, packing marks, and serial references.

  4. 04

    Hand over service

    Send parts, manuals, change notes, and the person who answers next.

SYS / 04 Procurement specification worksheet

Fleet Spec Builder

Prepare a Zongshen procurement brief around fleet duty cycle, load expectations, route conditions, service needs, and inspection records.

Select one option in each group to turn procurement priorities into a clear specification email.
01Fleet use case

Choose the work pattern the vehicles should support.

02Load and route priority

Frame the operating stress before model suggestions.

03Inspection needs

Tell sales which records matter before shipment.

04Service priority

Set the support expectation for procurement review.

Email summary

Your Zongshen fleet procurement brief

Fleet use caseFleet runs repeat daily routes that need stable specification control.

Load and route prioritySpecification should prioritize payload class, axle strength, and braking notes.

Inspection needsNeed inspection photos for model, packing, battery, controller, and labels.

Service priorityNeed service parts list for fleet maintenance planning.

Email this brief

SYS / 05 Start the procurement file

Send the duty cycle, load, route, and inspection scope to sales@zongshentricycle.com.

Send specification